Mission
Join us in advancing climate-sensitive modelling of Culex pipiens.Through this modelling exercise, we invite participants to submit model outputs that we will use to develop ensemble predictions of both the temporal activity of Culex pipiens at selected locations and its spatial suitability across Europe. By providing a common framework, we aim to compare predictions, identify areas of agreement and uncertainty, and create a shared modelling resource that can support future research and public health applications.
How to take part
- Mission Time: train your model on any data you like and predict the Culex pipiens time series at two locations. Send one time series per location, following the format of the CSV files provided, to info@vectormodelling.com by 20 November 2026.
- Mission Space: produce a habitat suitability prediction or seasonal abundance dynamics for Culex pipiens, using the CERRA climate data if you wish. Share your results and your GitHub repository, preferably by 20 November 2026.
Mission Time
We provide daily meteorological data extracted from the CERRA reanalysis for two study locations from 2014 to 2026:
- Petrovaradin, Serbia
- Larnaca, Cyprus
Observed mosquito counts for these two locations are not shared, because they have not been published yet. We will compare your predictions with the observations after the submission deadline.
The meteorological dataset includes daily air temperature, total precipitation, wind speed, and relative humidity. A map of the study locations together with summary plots of the environmental variables are provided below, while the complete time series can be downloaded in CSV format at this link.


What to do: train your model on any data of your choice, for example the dataset described below or your own, and use it to predict the average weekly seasonal dynamics of Culex pipiens at Petrovaradin and Larnaca. Participants are free to use any modelling framework. We would appreciate being informed of any additional publicly available datasets used so that they can be documented and, where appropriate, included in the shared dataset.
What to send: the predicted time series for each of the two locations, following the format of the CSV files provided (same dates and structure), to info@vectormodelling.com by 20 November 2026.
Mission Space
The second challenge focuses on the spatial distribution of Culex pipiens. No meteorological data are provided for this mission, but you can use the CERRA climate data as a starting point, together with any other environmental predictors, occurrence records or modelling techniques you consider appropriate.
The goal: produce either a habitat suitability prediction or seasonal abundance dynamics, on the CERRA grid, as a NetCDF or GeoTIFF file.
What to send: your results and a link to your GitHub repository, to info@vectormodelling.com, preferably by 20 November 2026.
Training data
Longo et al. have recently published a harmonised dataset of adult Culex pipiens mosquito abundance from 17 administrative regions across Italy, covering 2008-2022. A description of the dataset is available in this preprint, and the complete dataset can be downloaded from Zenodo.

You are free to train your models on any data you like. We encourage participants to make use of this dataset, where appropriate, to develop and calibrate their models for the two Missions described above.
Sharing models
We strongly encourage participants to share the scripts used to produce their results. Self-contained scripts greatly facilitate reproducibility and will help us compare model outputs under identical environmental conditions. With the authors' permission, contributed models may be integrated into the open VEClim model repository, allowing the community to run and evaluate them interactively after the workshop.
